deployed an updated version for Pearson Successnet to the labs in all elementary schools.
addressed the time synchronization problem plaguing the remote buildings.
working on the DNS problems district wide and have put new measures in place to .
addressing the slowness of the internet in the remote buildings. The current T1 internet connections to the remote buildings are saturated during lab use.
Priority on service of TILT directives and support.
excited to see so many iPod/iPad devices coming into the district. We are working on setup, management, maintenance, and distribution strategies.
Deployed Tux Paint out to the elementary labs.
Addressing Smartboard problems.
Upgraded Powerschool reports.
Upgraded Moodle server modules.
Upgrading all labs to Windows 7 and/or Apple OS 1.6.8
Getting and evaluation copy of Apple OS Lion.
Blakewood – We are / have…
working on the new wireless infrastructure to make it as available and efficient as possible.
Installed Windows 7 in the lab.
Addressing work tickets
Connects – We are / have…
Working on internet connection speed.
Addressing work tickets
Lakeview – We are / have…
Troubleshooting some wireless connectivity issues.
Addressing work tickets.
Luther – We are / have…
Fixed and phone line problems to the fire panel.
Addressing work tickets.
Rawson – We are / have…
Working on the Mac logon issues in the lab.
Working on connecting the field house via wireless link.
Addressing work tickets.
6-12 Campus – We are / have…
Addressing the problems with PLTW.
Working on staff and student share points.
Replacing library lab 1128 with newer computers.
Addressing work tickets.
Notes from the Technology Department
District Wide – We are / have…
Blakewood – We are / have…
Connects – We are / have…
Lakeview – We are / have…
Luther – We are / have…
Rawson – We are / have…
6-12 Campus – We are / have…
Addressing the problems with PLTW.
Working on staff and student share points.
Replacing library lab 1128 with newer computers.
Addressing work tickets.